72 Operating Manual RX1330 M3
Starting up and operation
Ê Follow the on-screen instructions (see also section "Configuring the
server and installing the operating system with the ServerView
Installation Manager" on page 74 or section "Configuring the server and
installing the operating system without the ServerView Installation
Manager" on page 75).
– System already installed:
Ê Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
Switching the server off
The power-on indicator (see figure 9 on page 59 and figure 10 on page 59)
lights up green.
Ê Shut down the operating system properly.
The server is switched off automatically and goes into standby mode. The AC
connected indicator lights up green.
I If the operating system does not switch the server off automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
V CAUTION!
There is a risk that data may be lost.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
– Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S4, you can configure
that the server is switched on/off controlled by timer.
– Ring indicator
The server is switched on by an internal or external modem.
– Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet
TM
).