44 A26361-K881-Z102-4-7619
Installing/Removing the Rack Model into the Rack Hardware Installation
Figure 14: Routing the fibre channel optical waveguide cable with protective hose
Ê Route the fibre channel optical waveguide cable on the articulated cable
carrier as shown in the figure and secure them with cable ties (1).
V CAUTION!
Please make sure that the so protected fibre channel optical waveguide
cable is routed in such a way on the articulated cable carrier that in the
extended as well as in the folded condition of the carrier no damages can
occur.
4.4.4 Mounting into 3rd-Party Racks
For mounting the server into the 3rd-Party Rack the following parts are
necessary:
two telescopic rails (assembled)
possibly four assembly brackets (VL; VR; HL; HR are punched onto the
brackets)
possibly eight mounting springs or plugwashers (figure 5 on page 34)
possibly protective hose for fibre channel optical waveguide cable
I To ensure the frontal assembling of the telescopic rails to the support
bracket and/or to the support uprights assembly brackets are supplied.
If none assembly brackets are supplied the telescopic rails are frontally
fastened on the support bracket and/or on the support uprights.
Ê Take the manual of the rack manufacturer regarding the mechanical instal-
lation and/or the climatic conditions to assistance.