2.16 COMMISSIONING THE BOILER - continued
(e) Abarometrictypedraughtstabiliser(ifttedintheue)shouldbesetforadraughtof
- 0.01in. to - 0.02in. (- 0.025mb to - 0.050 mb) of water column pressure with the burner off.
(f) Open all the valves in the water feed line.
(g) Open all the valves in the feed water line.
FEED PUMP
Close the isolating valve on the discharge side of the pump. Remove the priming plug from the
pumpheadandslowlyllthepumpwithwater.Replacetheprimingplugandtightensecuerly.
See the correct rotation of the pump on the motor fan cover. Start the pump and check the direc-
tion of rotation.
Vent the pump by means of the vent valve in the pump head. At the same time, open the discharge
isolating valve a little. Continue to vent the pump. At the same time, open the discharge isolating
valve a little more.
Close the vent valve when a steady stream of water runs out of it.
Completely open the discharge isolating valve.
Thebypassvalvelocatedinthedrainplugmaybeopenedduringthellingprocedure,closethe
bypass when the operation is stable.
DO NOT ALLOW THE PUMP TO RUN DRY.
(h) Open all the valves in the water feed line.
Switchonthefeedwaterpumpmotorandlltheboiler.
The operation of the pump controls should be checked by using the boiler blowdown valve (located
at the rear of the boiler).
When the water sight level gauge is reading two thirds full, the pump will stop.
Open the boiler blowdown valve and slowly drain the boiler. When the water level falls below
the PUMP ON probe, the pump should start. If the pump does not start check the probe connec-
tions.
Close the boiler blowdown valve.
(i) Close the boiler blowdown valve.
(j) Start the burner as detailed in Section 3 - Operation. Allow time for the fuel pump to prime itself.
(k) Aftertheburnerhasbeenringforapproximatelyveminutes,adjustthemainaircontrolgate
to obtain a clean combustion.
(l) Observetheamethroughthepeepholebetweentheelectrodesandadjusttheprimaryair
controlsothattheamecannotbeseen'backingup'theblasttube.Adjusttheairmaincontrol
toobtainafullswirlingameshapebrushingthewallofthefurnacebyobservingtheame
through the eye glass in the burner plate.
(m) Check the operation of the low water safety controls as detailed in Section 3 - Operation.