EasyManua.ls Logo

FULTON 60J - Maintenance; General

FULTON 60J
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
J OIL-E-08 2008
4
FIG. 17 BOILER MAINTENANCE
MAINTENANCE
SECTION 4
4.1 GENERAL
Toensuretheefciencyoftheboiler,carryouttheregularmaintenanceinstructionsdetailedbelow.
If any fault is found during these operations contact your Fulton representative.
CAUTION
It is essential that regular checks are made to ensure that scale buildup is not
taking place within the boiler. Such checks will ensure that water treatment
being applied to the boiler feed water is effective.
The lower hand hole doors should be removed after one month of operation and the interior of the
boiler thoroughly examined. If scale or sludge build up is observed, it should be removed and the
water treatment supplier advised.
Newgasketsmustbettedeverytimeahandholedoorisremoved.
Subsequent interior examinations should be carried out on a regular basis until satisfactory conditions
are observed. Thereafter, inspections should be carried out at three monthly intervals.
WARNING
Prior to the commencement of any work requiring the removal of cover
plates and the opening of the control panel box, the electrical supply
to the boiler must be isolated.
32
Safety valve
Outlet
Steam Pressure
Gauge
Feed Water
Ball Valve
Feed Water Non-
return Valve
Steam Supply
Line
Water Level
Probes
Oil Feed Line
Flame Detector
Ignition Electrodes
Water Column
Level Probes
4

Related product manuals