2.17 CLEANING STEAM LINES AND PRESSURE VESSELS
Duringtherstweekofboileroperation,cleanalloilanddirtfromtheboiler,thesteamlineand
condensate return line.
(a) Disconnect the condensate return pipe adjacent to the condensate return tank.
(b) Directthereturnstoaoordrainorothersafedischargepointandmakesafe.
(c) Leaveinthispositionforoneweektoallowallimpuritiestoushthrough.
(d) Drain the boiler completely each day.
(e) Aftertheweekiscompleted,drainandushthecondensatereturntank,removingallinstallation
sediment. Reconnect the condensate return pipe to the condensate return tank.
2.16 COMMISSIONING THE BOILER - continued
(n) Adjust the steam pressure control to suit the boiler application. It should be borne in mind that
boileraredesignedtooperatemostefcientlyattheirmaximumoperatingtemperature.When
boilers are to be operated below a pressure of 80 psi (5.5 bar) consideration should be given to
thettingofapressurereducingset(seeSection2.8-SteamSafetyValves).
If the pressure control is tted with a differential scale:
(see OEM literature in section 5)
(i) Set the main scale pressure to the pressure
indicated on the boiler data plate.
(ii) Set the differential scale to it's minimum pressure.
Ifthepressurecontrolhasaxeddifferential,
e.g. no adjustable differential scale, set the main
scale to the maximum pressure required.
Note: When boilers are tted with a sequence control:
(i) Set the main scale and differential scale as above.
(ii) Set the set-back pressure control to the required
set-back pressure.
FIG. 12 PRESSURE CONTROLLER
3