Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 20
d) Since an external electrical source is utilized, the boiler must be electrically grounded in
accordance with the National Electrical Code, ANSI/NFPA 70-latest edition.
e) In some cases the approval authority may insist that the installation conform to the
American Society of Mechanical Engineers ASME safety standard for controls and safety
devices for automatically fired boilers, or CSD-1.
In Canada, gas installations must be in accordance with the current CAN/CGA B149.1
and .2 and/or local codes. Electrical installations must be installed in accordance with the
current CSA C22.1 Canadian Electrical Code and/or local codes.
3. The following items are standard trim for Fulton Pulse Combustion
Hydronic Boilers:
a) Fully Insulated
b) Microprocessor Based Control - 120 volt
c) Low Water Cutoff (Probe Type)
d) Control Panel Completely Wired with Diagram
e) Operating Temperature Control
f) Hi-Limit Temperature Control w/ Manual Reset
g) Air Pressure Switches
h) Spark Ignition
i) Main Motorized Gas Valve
j) Main Gas Pressure Regulator
k) Manual Lubricated Gas Cock
l) Second Gas Valve (Solenoid)
m) Flame Rod
4. Included with and packaged separately with each boiler are the following
components:
a) ASME Pressure Relief Valve
b) Pressure-Temperature Gauge
c) Air Intake and Exhaust Pipe Adaptors
d) Installation, Operation, and Maintenance Manual
e) Elastomer Coated Fiberglass Cubes
f) Gas and Water Flex Connectors (for Models PHW750, 950, 1000, 1400 & 2000)
g) Intake and Exhaust Mufflers (for Models PHW750, 950, 1000, 1400 & 2000)
h) 1 Can Touch-up Paint