EasyManua.ls Logo

FULTON PulseHW Series - 25 Horizontal Installation Wall Penetrations

FULTON PulseHW Series
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 45
25. Horizontal Installation Wall Penetrations (Figure 13)
a) Select the point of penetration where a minimum of 1/4" per foot upward pitch can be
maintained.
b) When penetrating a non-combustible wall, the hole through the wall must be large
enough to maintain the pitch of the vent and provide sealing. Use adhesive material to
seal around the vent on both sides of the wall. When penetrating a combustible wall, a
wall thimble must be used. See next page Figure 14 for installation instructions. Minimum
wall thickness through which vent system may be installed is 3 1/4". Maximum wall
thickness through which vent system may be installed is 20 inches.
Figure 13

Table of Contents

Related product manuals