Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 3
Table of Contents
Introduction
Section 1 – Safety Warnings &
Precautions
Section 2 – Installation
1. General Specifications
2.
Introduction
3.
Standard Trim
4.
Components Included
5.
Accessories
6.
Locating the Boiler
7.
Installing Elastomer Cube Isolation
Mounts
8.
Installing Spring Isolation Mounts
9.
Installing Seismic Spring Isolation
Mounts
10.
Installing Boiler Trim
11.
Installing Water Piping
12.
Condensate Drain Kit
13.
Installing Condensate Drain Piping
14.
Installing Gas Piping
15.
Installing Field Wiring
16.
Sequence of Operation
17.
Air Intake Supply Piping Installation
Preparation
18.
Intake Muffler Installation
19.
Exhaust Vent Piping Installation
Preparation
20.
Exhaust Muffler Installation
21.
Air Intake & Exhaust Piping
Requirements for the Pulse Boiler
22.
Air Intake Supply and Exhaust Vent
Installation
23.
Vertical Vent Flashing and Installation
24.
Vertical Vent Termination
25.
Horizontal Installation Wall Penetrations
26.
Wall Thimble Installation
27.
Horizontal Vent Termination
28.
After Installation/Prior to Start-Up
29.
Installation Checkpoints
30.
Testing Ignition Safety Shut Off
31.
Measure Gas Flow Rate
32.
To Correct Input
33.
Rating the Boiler
34.
To Check for High Gas Pressure
35.
For High Gas Pressure Installations
36.
Before Leaving the Installation
Section 3 – Operation
1. Before Operating Your Boiler
2. Starting the Boiler
3. If the Boiler doesn’t start
4. Sequence of Operation
5. Sequence of Operation for Modulated
Pulse Hydronic Boilers
6. Programming Instructions for Yokogawa
UT320 Standard program
7. Worksheets
8. Advanced Programming Features
9. Siemens RWF40 Control
10. Linkage Adjustment for Pulse Modulated
Boilers
(continued on next page)