VSRT Series
Gas Fired Steam Boiler
This manual must be available to the boiler operator at all times.
VSRT-IOMM-2019-1

Table of Contents

Other manuals for FULTON VSRT Series

Questions and Answers

  • M
    Michael SnyderNov 22, 2025
    Why does my FULTON VSRT have flame failure during start-up?
    • B
      Brandon RussellNov 22, 2025
      Flame failure during start-up in your FULTON Boiler can stem from several issues: * **Gas supply:** Check for gas pressure problems and any intermittent supply. * **Power Supply:** Inspect the fuse or circuit breaker and replace or reset as needed. * **Air Settings:** Check the air servo motor's operation and settings. * **Ignition Electrodes:** Look for cracks in the porcelain, carbon buildup, and incorrect settings. Clean or adjust as necessary. * **UV Detector:** Ensure the detector is correctly located and clean. * **Burner Control:** Check voltage between the ignition terminal and neutral before lockout. Replace the control if there's no power. * **Loose wire:** Tighten wiring connections at the fuel valve circuit. * **Air Switch:** Adjust the air switch if the contac...
  • K
    Kathy PowellDec 3, 2025
    What to do if FULTON VSRT will not maintain pressure?

    Summary

    Safety Precautions

    Understanding Safety Information

    Defines WARNINGS, CAUTIONS, and NOTES for safe operation.

    General Hazard Warnings

    Alerts to potential hazards of steam boilers, gas, and flue gas leaks.

    Combustion Safety and Environmental Hazards

    Warnings about incomplete combustion, CO, and air quality hazards.

    Operational Safety and Equipment Warnings

    Cautions on handling pressurized fluids, hot surfaces, and equipment limits.

    Regulatory Compliance and Emergency Procedures

    Outlines legal regulations and emergency actions for hazardous conditions.

    Section 1 - Introduction

    1.1 General

    Explains pre-shipment inspections and the purpose of the manual.

    1.2 Technical Data

    Refers to Appendix A for specifications.

    1.3 Product Overview

    Describes the VSRT fuel fired steam boiler and its technology.

    Section 2 - Installation

    2.1 General

    States installation must be by competent personnel according to regulations.

    2.2 Pre-Installation

    Lists considerations before boiler delivery, including planning and access.

    2.2.1 Receiving Inspection

    Customer should examine equipment for damage; installer ensures correct fitting.

    2.2.2 Siting

    Warnings about access for maintenance and safe siting requirements.

    2.3 Ventilation

    Importance of adequate fresh, clean air for combustion and ventilation requirements.

    2.4 Connections

    Details various connections to the boiler system.

    2.4.1 Flue Outlet

    Guidance on flue type, size, installation, material, condensate drain, and draft.

    2.4.2 Blowdown Valves

    Types of blowdown connections and requirements for blowdown receptacles.

    2.4.3 Steam Safety Valve

    Warnings about factory-set safety valves and discharge piping requirements.

    2.4.4 Main Steam Valve

    Recommendations for steam outlet piping rise, sizing, and condensate drainage.

    2.4.5 Steam Pressure Gauge

    Assembly of the steam pressure gauge and connection requirements.

    2.5 Gas Supply

    Warnings and cautions regarding gas supply, installation, and leak testing.

    2.5.1 Gas Valve with Pilot Gas Line

    Explains the gas valve bypass system and components.

    2.5.2 Multi Bloc Gas Valves

    Refers to manufacturer leaflets and illustrates gas valves and actuators.

    2.6 Electrical Requirements

    Cautions and warnings about electrical work, supply voltage, and wiring.

    2.7 Water Supply

    Cautions regarding water softeners, chemical treatment, and warranty.

    2.12 Piping Specifications

    Basic considerations for piping, including arrangement, material, and supports.

    2.13 Insulation

    Warnings about insulating hot pipework and vessels, and recommendations for covers.

    Section 3 - Post Installation

    3.1 Gas Purge

    Warning about gas purging being for qualified persons only.

    3.2 Pipework Leak;Pressure Tests

    Procedures for soundness and leak detection fluid tests.

    3.3 Electrical Installation Testing

    Specifies earth bond test and terminal tightening.

    3.4 Final Installation Inspection

    Lists checks for ventilation, gas supply, flue system, and pipework.

    Section 4 - Commissioning

    4.1 Commissioning the Boiler

    Emphasizes commissioning by qualified persons and outlines flue commissioning.

    4.1.2 Boiler Inspection and Initial Firing Gas Burner

    Steps for boiler inspection, water analysis, wiring, and feedwater pump checks.

    4.1.3 Adjustment of the Yokogawa UT-32 A Operating Controller

    Explains controller keys and procedures for adjusting set points and PID parameters.

    Section 5 - Operation

    5.1 General

    Instructions for competent operator use, safety, and understanding controls.

    5.2 Controls

    Overview of controls for efficient boiler operation.

    5.2.1 Boiler Controls

    Explains limiters, feedwater pump, high water controller, and burner programmer.

    5.2.2 Control Panel

    Explains indicator lights on the control panel and their meanings.

    5.2.3 Steam Pressure Controls

    Describes operating pressure transducer and high pressure limiter.

    5.2.4 Water Level Control Probes

    Describes types of water level probes for high integrity monitoring.

    5.3 Filling the Boiler All Models

    Step-by-step instructions for filling the boiler safely.

    5.4 Draining the Boiler

    Cautions regarding boiler water discharge and procedures for manual/automatic blowdown.

    5.5 Boiler Start-Up (From Cold) All Models

    Step-by-step guide for cold start-up, including safety checks and pressure build-up.

    5.6 Boiler Shut-Down

    Procedures for short, medium, and long-term boiler shutdown.

    Section 6 - Maintenance

    6.1 Boiler Platform (If Fitted)

    Recommendations for mobile platforms for easy access and site risk assessment.

    6.2 Visual Checks

    Inspecting pipework, fittings, and handholes for leaks.

    6.3 Burner Flame Sensor Test

    Procedure to test the flame safeguard sensor's operation.

    6.4 Water Level and Low Water Safety Control Procedures

    Procedures to ensure correct functioning of water level and low water safety controls.

    6.5 Blowdown Procedures

    Importance of blowdown for removing sludge and scale.

    6.5.1 Main Boiler Blowdown (Manual)

    Step-by-step guide for manual boiler blowdown.

    6.5.2 Water Level Gauge (Sight Glass) Blowdown

    Procedure for blowdown of the water level gauge sight glass.

    6.6 Boiler Internal Inspection

    Procedure for inspecting the boiler interior for scale or sludge build-up.

    6.7 Fitting New Gaskets to Boiler Inspection Holes

    Important information regarding fitting new gaskets.

    6.8 Schedule of Operator Tests and Checks

    Advice on test frequencies, maintenance of gas parts, and fault reporting.

    6.8.1 Daily

    Daily inspection and checks for leakage, low water level, and blowdown.

    6.8.2 Weekly in Addition

    Weekly checks including safety valve security, pump test, evaporation check, flame failure.

    6.8.3 Monthly in Addition

    Monthly checks including internal water space inspection and feedwater line cleaning.

    6.8.4 Six Monthly Gas Safe Engineer Only

    Procedures for gas safe engineers including feedwater tank flush, flue test, combustion check.

    6.8.5 Annually Gas Safe Engineer Only

    Annual inspection of the pilot assembly.

    6.8.6 After All Repairs & Maintenance - In Addition

    Post-repair checks including safety checks, firing, and combustion analysis.

    6.9 Maintenance Record Keeping

    Importance of boiler log sheets for history and maintenance.

    Section 7 - Inspection

    7.1 Inspection

    Requirement for annual inspection by a qualified boiler inspector.

    Section 8 - Troubleshooting

    8.1 Troubleshooting Gas Boiler

    Lists common problems like ignition failure, flame failure, and poor combustion.

    8.2 Troubleshooting Feedwater Pump

    Lists problems with the feedwater pump not running, overload, capacity, or noise.

    Appendix A

    VSRT-10 Specifications and Features

    Details VSRT-10 model features, controls, listings, and trim kit items.

    VSRT-15 Specifications and Features

    Details VSRT-15 model features, controls, listings, and trim kit items.

    VSRT-20 Specifications and Features

    Details VSRT-20 model features, controls, listings, and trim kit items.

    VSRT-30 Specifications and Features

    Details VSRT-30 model features, controls, listings, and trim kit items.

    VSRT-40 Specifications and Features

    Details VSRT-40 model features, controls, listings, and trim kit items.

    VSRT-50 Specifications and Features

    Details VSRT-50 model features, controls, listings, and trim kit items.

    VSRT-60 Specifications and Features

    Details VSRT-60 model features, controls, listings, and trim kit items.

    Technical Information: Recommended Water Conditions

    Recommended water quality parameters for feedwater and boiler water.

    TI-149: High Integrity Water Limiters

    Details on Guided Wave Radar, Vibrating Fork, and conductive water level limiters.

    TI-30: Automatic TDS Blowdown Systems

    Explains the operation and calibration of Automatic TDS control blowdown systems.

    Material & Workmanship Guarantee

    General Guarantee

    Details the general guarantee terms for Fulton products.

    On the Fulton Boiler Pressure Vessel

    Specific guarantee terms for the boiler pressure vessel.

    FULTON VSRT Series Specifications

    General IconGeneral
    Maximum Allowable Working Pressure (MAWP)150 psi
    Model SeriesVSRT
    CategoryBoiler
    TypeVertical Tubeless
    Fuel TypeGas, Oil
    Operating PressureUp to 150 psi (10.3 bar)
    Burner TypeForced Draft
    ConstructionASME Code Construction
    Control SystemMicroprocessor-Based Control System

    Related product manuals