This manual must be available to the boiler operator at all times.
VMP-IOMM-2018-2
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
VMP (vertical multi-port)
Fuel Fired Steam Boiler

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the FULTON VMP Series and is the answer not in the manual?

Summary

Safety Warnings and Cautions Explained

Safety Warnings and Cautions in Manual

Regulatory Compliance for Boiler Operation

Introduction to the Fulton VMP Boiler Manual

General Boiler and Manual Information

General information regarding boiler manufacturing and manual usage.

Technical Specifications Reference

Refers to appendix for detailed product specifications and dimensions.

VMP Boiler Product Overview

Describes the VMP fuel fired steam boiler's design and construction.

Boiler Installation Guide

General Installation Requirements

General requirements for competent installation according to safety regulations.

Pre-Installation Planning and Site Preparation

Considerations before boiler delivery, including site preparation and planning.

Receiving Equipment Inspection

Procedure for inspecting equipment for damage upon receipt.

Boiler Siting and Location Guidelines

Guidance on locating the boiler for safe operation and maintenance.

Ventilation Requirements for Combustion

Requirements for adequate fresh air supply for safe and efficient combustion.

Boiler Connections and Pipework

Details on connecting various pipes and valves to the boiler system.

Flue Outlet Installation

Guidance on flue installation, diameter, height, and clearances.

Blowdown Valve System

Information on boiler blowdown valves and their connections.

Main Boiler Blowdown Valve Connection

Description of the main boiler blowdown connection.

Water Bottle and Level Probes

Details regarding the water bottle containing level probes and blowdown connection.

Water Level Gauge Set Installation

Information on water level gauge sets and their blowdown connections.

Steam Safety Valve Installation and Maintenance

Instructions for installing and maintaining the safety valve, including discharge piping.

Main Steam Valve and Pipework

Guidance on distribution pipework from the main steam valve.

Steam Pressure Gauge Assembly

Instructions for assembling and orienting the steam pressure gauge.

Boiler Fuel Supply Systems

General guidance on boiler fuel supply systems.

Natural and Manufactured Gas Supply

Requirements for natural/manufactured gas supply, pressure, and regulators.

LPG Gas Supply Installation (Propane;Butane)

Specific installation requirements and considerations for LPG gas supply.

Oil Supply System Installation

Guidelines for positioning storage tanks and connecting oil supply lines.

Electrical Requirements and Connections

Electrical connection requirements and safety precautions.

Electrical Customer Connections

Details on customer connections for pumps, indicators, and interlocks.

Water Supply System Requirements

Guidelines for water softener, chemical treatment, and feedwater system.

Glossary of Water Supply Terms

Definitions of various water supply terms relevant to boiler operation.

Piping Specifications and Installation

Guidelines for piping arrangement, materials, supports, and installation.

Pipework and Vessel Insulation

Requirements for insulating pipework and vessels to prevent heat loss and injury.

Pipework Leak and Pressure Testing

Procedures for testing pipework for leaks and pressure integrity after installation.

Boiler Commissioning Procedures

Initial Boiler Commissioning Steps

Step-by-step guide for initial boiler commissioning and checks.

Dual Fuel Burner Initial Firing and Inspection

Initial firing procedures for dual fuel burners.

Gas Burner Initial Firing and Inspection

Initial firing and inspection procedures for gas burners.

Oil Burner Initial Firing and Inspection

Initial firing and inspection procedures for oil burners.

Setting Burner Controls for Low;High Fire

Setting burner controls for low and high fire operation.

Fully Modulating Burner Setup

Setting procedures for fully modulating burner operation.

Non-Modulating Gas Burner Controls

Procedures for setting gas pressure switches and regulators.

Multi-Bloc Gas Valve Systems

Description of multi-bloc gas valve assemblies.

Boiler Operation Guide

Primary Air Adjustment for Combustion

Adjusting primary air for optimal combustion.

Switching Fuels on Dual Fuel Burners

Procedure for switching fuels on a dual fuel burner.

Filling the Boiler with Water

Step-by-step instructions for filling the boiler with water.

Draining the Boiler for Maintenance

Procedures for draining the boiler for maintenance or shutdown.

Boiler Start-Up from Cold

Step-by-step guide for starting the boiler from a cold state.

Boiler Restart After Short Shutdown

Procedures for restarting the boiler after a short shutdown.

Boiler Shutdown Procedures

Procedures for shutting down the boiler for various durations.

Short-Term Boiler Shutdown (Hours)

Instructions for short-term boiler shutdown procedures.

Medium-Term Boiler Shutdown (Days)

Instructions for medium-term boiler shutdown procedures.

Long-Term Boiler Shutdown and Storage

Instructions for long-term boiler shutdown and storage.

Boiler Maintenance Schedule

Boiler Platform Access

Information about boiler platforms for accessing top components.

Routine Visual Inspections

Routine visual inspection of pipework, valves, and fittings for leaks.

Burner Flame Sensor Testing

Procedure for testing the burner's flame safeguard sensor.

Water Level and Low Water Safety Controls

Procedures to ensure correct functioning of water level and low water safety controls.

Feedwater Pump Operational Test

Testing the feedwater pump's operation and cycle.

Low Water Level Safety Check

Checks for low water limiters, alarms, and burner shutdown.

Evaporation Rate Check

Procedure for checking evaporation rate and pump response.

Boiler Blowdown Procedures

Procedures for keeping the boiler free from sludge and scale.

Manual Main Boiler Blowdown

Manual procedure for blowing down the main boiler.

Water Bottle Blowdown Procedure

Procedure for blowing down the water bottle.

Water Level Gauge Blowdown

Procedure for blowing down the water level gauge.

Boiler Internal Inspection Schedule

Requirements and schedule for internal boiler inspections.

Gasket Replacement for Inspection Holes

Instructions for fitting new gaskets to boiler inspection holes.

Important Information for Gasket Fitting

Crucial information regarding gasket replacement and maintenance.

Operator Tests and Checks Schedule

Recommended schedule for boiler tests and checks.

Daily Operator Tests and Checks

Daily tests and checks for boiler operation and safety.

Weekly Operator Tests and Checks

Weekly tests and checks to be performed in addition to daily checks.

Monthly Operator Tests and Checks

Monthly tests and checks for boiler maintenance.

Six Monthly Service Procedures

Procedures for the six-monthly boiler service.

Annual Service Procedures

Procedures for the annual boiler service.

Five Year Maintenance Recommendations

Recommended maintenance after 5 years of operation.

Post-Repair and Maintenance Checks

Checks to perform after repairs or maintenance.

Maintenance Record Keeping Importance

Importance of maintaining boiler log sheets for history and investigation.

Boiler Troubleshooting Guide

Troubleshooting Gas Boilers

Common problems and remedies for gas-fired boilers.

Troubleshooting Oil Boilers

Common problems and remedies for oil-fired boilers.

Feedwater Pump Troubleshooting

Common problems and remedies related to the feedwater pump.

Siemens LMV Control System Errors

Error code list and meanings for Siemens LMV control systems.

Appendix A: Technical Information Sheets

Appendix B: Boiler Wiring Diagrams

Appendix C: Spare Parts Ordering

Ordering Spare Parts Information

Details required for ordering replacement parts correctly.

Appendix D: Spirax High Integrity Level Controls

Daily Testing of Water Level Controls

Daily testing requirements for boiler water level controls.

Low Water Safety Function Daily Test

Procedure for daily testing of the low water level safety function.

Low Water Safety Function Weekly Test

Weekly test procedure for low water level safety function.

Fulton Boiler Pressure Vessel Guarantee

Fulton General Guarantee Terms

FULTON VMP Series Specifications

General IconGeneral
BrandFULTON
ModelVMP Series