VMP-IOMM-2018-2
Fulton Ltd
Page 55
MAINTENANCE - 5
10. Visually inspect the internal water space (see Section 5.6).
11. Clean the water level gauges (sight glasses).
If any leakage is evident, the gasket needs replacing (see Section 5.7).
12. Cleananywatertrapsandstrainersttedinthefeedwaterline.
Check feedwater and boiler water quality against the values given in Appendix A - TI-139-
Recommended Water Conditions.
Note: Use only genuine Fulton replacement parts.
WARNING
Ensure the main electrical supply is isolated before starting work.
!
5.8.3 MONTHLY IN ADDITION
5.8.4 SIX MONTHLY SERVICE
The boiler must be drained and isolated before the following maintenance procedures are
carried out (see Section 4.6 - Draining the Boiler).
1. Visually inspect feedwater pipe into the boiler.
Ensure the pipe is not blocked, clean as required.
2. Clean the ignition electrode.
3. Cleanouttheuepasses.
4. Apply a small quantity of oil to the bearings of the burner motor and the feedwater pump
motor.
5. Clean the burner scroll fan.
6. Remove components from threaded stub pipes, clean and inspect.
7. Rod through top connections of the water level gauge and water bottle.
8. Drainandushthefeedwatertank.Cleananyltersinthetank,inthefeedwaterlineorinthe
feedwater pump.
9. Clean the water level probes.
10. Testtheueusingthefollowingprocedures:
• Visual Inspection
• Smoke Test
11. Check the burner combustion.
12. Checktheconditionofthegasvalvelter(iftted),renewasrequired.
WARNING
Maintenance on gas related parts of a boiler must be carried out by competent, trained personnel who are GAS
SAFE/ACS registered, and who have the necessary equipment to check combustion.
!