EasyManua.ls Logo

FULTON VMP Series - Important Information for Gasket Fitting; Operator Tests and Checks Schedule

FULTON VMP Series
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VMP-IOMM-2018-2
Fulton Ltd
Page 45
MAINTENANCE - 5
CAUTION
It is vitally important that the instructions given in this manual are strictly adhered to.
Failure to carry out the daily, weekly, monthly and six monthly checks could result in a drastic
reduction in the life expectancy of the boiler.
!
SECTION 5 - MAINTENANCE
Tests should be carried out by a competent person trained to perform such tests. If any test shows that the
equipment is not operating correctly, the fault should be investigated and corrected before the boiler is used.
Anyrecticationorrepairsshouldbecarriedoutbytrained,competentservicepersonnel.
Platforms are designed to allow easy maintenance access to the components at the top of the
boiler (i.e. the water level probes, main steam valve, vent and safety valves).
It is the responsibility of the user to ensure that a site risk assessment is carried out for the safe
use of the ladders and working at height on the platform.
5.1 BOILER PLATFORM (IF FITTED)
5.2 VISUAL CHECKS
Inspectthesteamandfeedwaterpipework,valvesandttingsforsignsofleakage.Ifleaksare
suspected, shut-down and evacuate the system to atmospheric pressure before attempting any
repairs.
Note: Ensure that the water level is maintained during the pressure build-up. If any part of the equipment is not
operating correctly, the fault should be investigated before the boiler is used. Ensure that all blowdown pipework
is safe and discharged to a blowdown receptacle.

Table of Contents

Related product manuals