VMP-IOMM-2018-2
Fulton Ltd
Page 56
MAINTENANCE - 5
5.8.7 AFTER ALL REPAIRS & MAINTENANCE IN ADDITION
1. Complete all safety checks in the daily and weekly maintenance section.
2. Fire the boiler and perform combustion safety checks.
3. Analyse combustion throughout the range and verify proper operation of safety devices.
5.8.5 ANNUAL SERVICE
The boiler must be drained and isolated before the following maintenance procedures are
carried out (see Section 4.6 - Draining the Boiler).
1. Inspect the pilot assembly.
2. Cleanandexamineuewaysandremoveloosescalefrominsideshell.
3. Examine refractory brick.
4. Check all panel wiring connections for conditions and tightness.
5. Rellboilerwithwater,checkingforleaks.
6. Test for gas safety.
7. Checkoilpressureorgasowrateandcombustionparameters.
Re-commissioning.
8. Rellboilerandre-commissionburner–checkallfunctionaloperationsofburnerandboiler
includingwatersafetychecksandamefailureprocedures.Operateboilertoworking
pressure and check safety valves for operation and settings.
9. Inspect and clean blowdown separator if part of installation.
5.8.6 AFTER 5 YEARS
10. Fulton Ltd recommend replacement of all threaded stub pipes on the boiler OR to your
inspectors satisfaction.
WARNING
Maintenance on gas related parts of a boiler must be carried out by competent, trained personnel who are GAS
SAFE/ACS registered, and who have the necessary equipment to check combustion.