EasyManua.ls Logo

FULTON VMP Series - Boiler Internal Inspection Schedule; Gasket Replacement for Inspection Holes

FULTON VMP Series
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VMP-IOMM-2018-2
Fulton Ltd
Page 44
OPERATION - 4
4.8.3 LONG TERM SHUT-DOWN (WEEKS)
4.8 BOILER SHUT-DOWN
4.8.1 SHORT TERM SHUT-DOWN (HOURS)
4.7.1 BOILER START-UP FOLLOWING SHORT TERM SHUT-DOWN
4.8.2 MEDIUM TERM SHUT-DOWN (DAYS)
To store the boiler in a corrosion-free situation there are two practical solutions:
1. Fullyoodtheboilertoexcludeasmuchairaspossible.
2. Drain the boiler completely.
Remove all hand holes.
Open all gas/oil side access doors.
Additionally you could introduce a form of convection heating to the gas/oil and water side.
A very effective solution is to install a small heater.
If the boiler has been shut-down short term (see Section 4.8.1 - Short Term Shut-Down), the
large thermal mass in the boiler will maintain the internal temperature to a point that the boiler
canbesimplyswitchedon(preferablyonlowre)andthenlefttoreachworkingtemperature/
pressure.
Switch Boiler switch to OFF on the boiler control panel switch.
Theburnerwillstopring,post-purgeandthenstop.
1. Shut the main steam valve.
2. Leave Pump switch ON.
3. Switch Boiler switch OFF.
4. Shut off fuel supply.
Note: Ensure the boiler water treatment levels for dissolved oxygen are within the specied limits.

Table of Contents

Related product manuals