VMP-IOMM-2018-2
Fulton Ltd
Page 1
INTRODUCTION - 1
SECTION 1 - INTRODUCTION
1.1 GENERAL
1.2 TECHNICAL DATA
Forafullspecicationreferto
1.3 PRODUCT OVERVIEW
TheVMPfuelredsteamboilerisaverticaltwo-passboilerofsimple,efcientdesignand
construction.
CONTINUED ON NEXT PAGE
Prior to shipment, the following inspections and tests are made to ensure the highest standards of
manufacturing for our customers:
• Material inspections
• Manufacturing process inspections
• Hydrostatic test inspection
• Electrical components inspection
• Operating test
• Crating inspection
This manual is provided as a guide to the correct operation and maintenance of your Fulton
equipment, and should be read in its entirety and be made permanently available to the staff
responsible for the operation of the boiler. It should not, however, be considered as a complete
code of practice, nor should it replace existing codes or standards which may be applicable.
Fulton reserves the right to change any part of this installation, operation and maintenance
manual.
Installation, start-up, and maintenance of this equipment can be hazardous and requires trained,
qualiedinstallersandservicepersonnel.Trainedpersonnelareresponsiblefortheinstallation,
operation, and maintenance of this product, and for the safety assurance of installation, operation,
and maintenance processes. Do not install, operate, service or repair any component of this
equipmentunlessyouarequaliedandfullyunderstandallrequirementsandprocedures.