EasyManua.ls Logo

Galcon G.S.I DC - Testing Fertilizer and Master Valve; Creating an Irrigation Program

Galcon G.S.I DC
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G.S.I DC Installation and Operation Guide
25
Figure 31: Stop Test Sequence Screen
To test the fertilizer:
Press mode
and at the same time to open the fertilizer for 15
seconds.
Figure 32: Fertilizer Test Screen
To test the Master valve:
1. Press
until the Test screen is displayed (Figure 29).
2. Press to open the Master valve for 30 seconds.
Creating an Irrigation Program
Notes:
When locally creating the irrigation program:

Related product manuals