rev.1.1 Page 8-13
Before E-Cell Stacks™ start, check:
1. All Valves are closed
2. All pumps are in the “OFF” position
3. DC power is turned “OFF”
4. Safety equipment is installed and operational.
8.2.1 Fill the system with water and establish Dilute Flow
1. Open Concentrate Make-up Valve
2. Open Concentrate Inlet Valve
3. Open Pump Suction Valve
4. Open Pump Discharge Valve
5. Open the Concentrate Bleed Valve
6. Open the Dilute Rinse Outlet Valve
7. Slowly crack open the Dilute Feed Inlet Valve, maintain a low feed pressure (less than 40 psi)
to the E-Cell Stacks™ to ensure a slow Concentrate Loop and Dilute Loop fill.
8. Adjust the Dilute Rinse Outlet Valve to establish the correct flow rate: 7.5-20.0 gpm/ 1.70-
4.54 m
3
/h per MK-2E, MK-2Pharm or MK-2PharmHT Stack™; 2.5-6.7 gpm/0.57-1.52 m
3
/h per
MK-2Mini or MK-2MiniHT Stack™.