EasyManua.ls Logo

GE enFlow IV - System Setup and Operation; Unpacking and Initial Component Setup; Starting System Operation

GE enFlow IV
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 9 of 40 -
4400-0024-EN Rev A
Unpacking the enFlow IV uid/blood warming system
Upon receipt of the enFlow IV uid/blood warming system components, visually inspect the shipping containers and internal contents for damage that may
have occurred during shipment. If there is any visible or mechanical damage to the contents, or if the order is incomplete, please contact Customer Service
immediately. The components for each model are reected below:
• Model 100
Warmer
Warmer Cord Clip
IV Line Clip
USB Manual
Patient Leakage Report
Certicate of Conformance
• Model 121
Controller
Patient Leakage Report
Warmer Mount (Warmer Mount Instructions)
USB Manual
• Model 200
Disposable Cartridge
IFU
Model 202
Disposable Cartridge with IV extension set
IFU
To begin operation of the enFlow IV uid/blood warming system
a. Place the Controller on a rm, level surface or on an IV pole with an outside dimension of no greater than 3.0 cm (1.25 in). Two Controllers may also be
mounted next to each other on an IV pole as shown below. The Controller’s display will have a right-side-up orientation regardless of its position.

Other manuals for GE enFlow IV

Related product manuals