EasyManua.ls Logo

GE Frac-920 - Page 42

GE Frac-920
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Feed tube
During fractionation, the tube rack can be moved forward one tube with the instruction
FeedTube.
1
Select menu System Control:Manual:Frac in UNICORN.
2
Select the instruction FeedTube in the Frac list.
3
Click on the Execute button. The tube rack moves on to the next tube after the set
delay volume has been collected.
Ignore_LastTube
The tube position in the rack which is defined in the start protocol to have the last tube
can be ignored with the instruction Ignore_LastTube.
When the last tube is reached and there are more fractions to collect, an alarm is gen-
erated and the system is paused. You can then fill up with new tubes, and use the instruc-
tion Ignore_LastTube.
1
Select menu System Control:Manual:Frac in UNICORN.
2
Select the instruction Ignore_LastTube in the Frac list.
3
Click on the Execute button.
4
Fill up the rack with new tubes.
42 Frac-920 and Frac-950 Operating Instructions 28-9622-09 AC
4 Operation
4.3 Fraction Collector Frac-950

Related product manuals