EasyManuals Logo

GE LOGIQ F6 Service Manual

GE LOGIQ F6
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
GE LOGIQ F SERIES
D
IRECTION 5446617-100, REVISION 10 BASIC SERVICE MANUAL
3 - 10 Section 3-5 - Completing the Installation
3-5-2-1 Back-end Processor Power Down (cont’d)
2.) The System-Exit window is displayed.
Figure 3-5 System Exit Window
3.) Using the Trackball or Select key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
blue.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
3-5-2-2 Scanner Shutdown
Disconnect the Mains Power Cable if necessary. For example: Relocating the scanner.
3-5-3 Transducer Connection
1.) Plug the probe connector into the probe port, then lock the probe.
NOTE: Please ensure that the probe latch is in an unlocked position before you connect the probe to the
system.
NOTE: It is not necessary to turn OFF power to connect or disconnect a probe.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ F6 and is the answer not in the manual?

GE LOGIQ F6 Specifications

General IconGeneral
BrandGE
ModelLOGIQ F6
CategoryMedical Equipment
LanguageEnglish

Related product manuals