GE HEALTHCAREDRAFT LOGIQ™ S7 EXPERT/PRO
DIRECTION 5460683, REVISION 3 DRAFT (JUNE 25, 2014) SERVICE MANUAL
Chapter 3 - Setup Instructions 3-1
Chapter 3
Setup Instructions
Section 3-1
Overview
3-1-1 The Purpose of Chapter 3
This chapter contains information needed to setup the LOGIQ™ S7 ultrasound system. Included are
procedures to receive, unpack and configure the equipment.
A worksheet is provided (see: page 3-58 to page 3-59) to help ensure that all the required information
is available, prior to setup the system.
Section 3-2
Set Up Reminders
3-2-1 Average Installation Time
Once the site has been prepared, the average installation time required is shown in Table 3-2 below.
Table 3-1 Contents in Chapter 3
Section Description Page Number
3-1
Overview
3-1
3-2
Set Up Reminders
3-1
3-3
Receiving and Unpacking the Equipment
3-4
3-5
Preparing for Set Up
3-8
3-6
Connection of Auxiliary Devices
3-10
3-7
Completing the Set Up
3-21
3-8
Printer Installation
3-30
3-9
System Configuration
3-39
3-10
Available Probes
3-43
3-11
Software/Option Configuration
3-46
3-12
Connectivity Setup
3-47
3-13
Configuring Connectivity
3-51
3-14
Connectivity Setup Worksheet
3-58
3-15
Paperwork
3-60
Table 3-2 Average Installation Time
Description Average Installation Time Comments
Unpacking the scanner 0.5 hours
Installing the scanner / options / printers 0.5 to 1.5 hours depends on required configuration
DICOM Option (connectivity) 0.5 - 1.5 hours depends on configuration amount