EasyManua.ls Logo

GE LOGIQ V5 Expert

GE LOGIQ V5 Expert
305 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup reminders
LOGIQ V3/V5/V5 Expert – Basic Service Manual 3-3
5726264-100 English Rev.8
3-2 Setup reminders
3-2-1 Average setup time
Unpacking the LOGIQ V3/V5/V5 Expert: 30 minutes
Set up LOGIQ V3/V5/V5 Expert options: 30 minutes
DICOM Network Configuration: 30 minutes or more,
depending on the configuration
Install Insite: 0.5 hour
The LOGIQ V3/V5/V5 Expert installation and functional
checkout will take approximately 1 hour. LOGIQ V3/V5/V5
Expert consoles with optional equipment may take slightly
longer.
3-2-2 Setup warnings
DANGER
WHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE
OF OPENING THE AC GROUND LINE (I.E., METER’S
GROUND SWITCH IS OPEN), DON’T TOUCH THE
ULTRASOUND SYSTEM!
CAUTION
To prevent electrical shock, connect the unit to a properly
grounded power outlet. DO NOT use a three to two prong
adapter. This defeats safety grounding.
CAUTION
DO NOT wear the ESD wrist strap when you work on live
circuits and more than 30 V peak is present.
CAUTION
DO NOT operate this unit unless all board covers and frame
panels are securely in place. System performance and cooling
require this.

Table of Contents

Related product manuals