4.6 UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
1
Procedure for the unpacking of the UPS:
Make sure to have sufficient space
around the UPS before you start
unpacking.
Cut the two straps A fixing the
carton box.
2
Remove package B and C.
Remove the protection D outside
the cabinet and the accessories bag.
3
Fig. 4.6-1 LP33 Series 20 & 30 unpacking sequence
Use a forklift to raise the UPS from the
floor.
Remove the two wooden plates E.
NOTE !
Be aware of the heavy
weight of the UPS, in
particular if already
equipped with
Batteries.
Included in the delivery you can find the following parts:
Control Bus cables (only for RPA Parallel System)
CD-ROM connectivity
An accessories bag
NOTE !
The wheels are designed only for limited movements on the installation site.
LPS33U_030-040_Unpacking_02
GRAVITY
CENTER
of
of
GRAVITY
CENTER
D
UL
C
B
E
E
E
LPS33U_030-040_Unpacking_03

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE lp33 20 series and is the answer not in the manual?

GE lp33 20 series Specifications

General IconGeneral
BrandGE
Modellp33 20 series
CategoryUPS
LanguageEnglish

Related product manuals