EasyManuals Logo

GE lp33 20 series User Manual

GE lp33 20 series
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
Critical Power
Modifications reserved
Page 33/43
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Installation Guide LP33 Series 20 & 30 UL S2
Fig. 4.9.4-4 Control bus location RPA Parallel System
Control bus location RPA Parallel System
Place the cables and connect them as indicated in the diagram Fig. 4.9.4-4 following these
procedures:
Fix the control bus cables with the appropriate tie-wrap E”.
Place the cables between the parallel units in separated protected conduit to avoid any
accidental disruption.
Put in place the front screen B (Fig. 4.9.4-1) paying attention to not damaging the control bus
cables.
It is important to place the units in sequence of their assigned number.
A unit number from 1 to 4, is defined by the setting of parameters and displayed on the control panel.
This number is also marked inside and outside the packaging.
The standard length of the control bus cable between two parallel units is 26 ft / 8 m.
LPS33U_020-030_S2_RPA connection_02
LP33 Series 20 & 30
1
LP33 Series 20 & 30
2
LP33 Series 20 & 30
3
LP33 Series 20 & 30
4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE lp33 20 series and is the answer not in the manual?

GE lp33 20 series Specifications

General IconGeneral
BrandGE
Modellp33 20 series
CategoryUPS
LanguageEnglish

Related product manuals