EasyManua.ls Logo

GE Profile Harmony WPGT9360

GE Profile Harmony WPGT9360
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 61 –
18. Attach the washer control board to the new
backsplash by replacing the 4 Phillips-head
screws removed from the washer control board
earlier.
23. Secure the new backsplash to the washer using
the 2 Phillips-head screws removed earlier.
22. Insert the tabs on the bottom front of the new
backsplash into the slots on the washer and
rotate the backsplash into place.
21. Place the gray wire from the serial port under
the strain relief of the new backsplash.
Screw
Screw
Rear of Washer
24. Reconnect house utilities.
25. Plug the washer and dryer back in.
19. Connect the washer control board to the new
backsplash by sliding the ribbon connector
on the new backsplash onto the metal pins on
the control board and pushing in. Make sure
the ribbon is not twisted before inserting the
connector.
Strain Relief
Screws
20. Secure the new washer backsplash to the rear
cover using the 2 Phillips-head screws removed
earlier.

Related product manuals