EasyManuals Logo

GE SG SERIES 10 User Manual

GE SG SERIES 10
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc 56/88 Operating Manual
SG Series
10, 20, 30 & 40 kVA
7.3.3 From Manual Bypass (Q2) to normal function On-line
Initial status: Load supplied from Manual Bypass.
All Q2 of the system are closed
.
First operated unit All other units of the system
1. Close Q1 (Pos. I) on all Units.
The Rectifiers will start automatically and at the closure of Q1 of the last Unit, the
Bypass of all Units will be activated.
First operated unit All other units of the system
2. Connect the Battery to all Units by closing the external Battery Switches or
Fuses, in case of External Battery.
3. Open Q2 (Pos. O) on all Units.
First operated unit All other units of the system
Continue

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SG SERIES 10 and is the answer not in the manual?

GE SG SERIES 10 Specifications

General IconGeneral
BrandGE
ModelSG SERIES 10
CategoryUPS
LanguageEnglish

Related product manuals