EasyManuals Logo

GE SIMON XT User Manual

GE SIMON XT
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
Chapter 5
Testing
39
Testing communication
Test communication between your system and the central monitoring station or a voice report destination at
least once per week to make sure you have the proper telephone connection.
To perform a communication test:
1. Scroll to System Tests.
2. Press Enter. The display shows Enter Code.
3. Enter the master code.
4. Press Enter to accept the master code. The display shows Comm Test.
5. Scroll to Comm Test.
6. Press Enter. The display shows Comm Test is On.
7. After the communication test is successful, the display shows Comm Test Ok.
8. Press STATUS repeatedly to exit.
Note: If your system is not connected to a central monitoring station and you do not have a voice report destination
programmed, you wont be able to perform the communication test.
If the communication test is successful, the system displays Comm Test Ok. If the test is unsuccessful, the
STATUS button will light and within ten minutes the panel will display Comm Failure. If a communication
test fails, call your security system dealer.

Other manuals for GE SIMON XT

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SIMON XT and is the answer not in the manual?

GE SIMON XT Specifications

General IconGeneral
Control PanelYes
DisplayLCD
Backup BatteryYes
CategorySecurity System
ConnectivityWireless
Zones40
CommunicationCellular, Landline
KeypadBuilt-in
ManufacturerGE Security
TypeWireless
Power SupplyAC Adapter

Related product manuals