EasyManua.ls Logo

GE vb8 - Coast-Down;Run-Up; Tips for Coast-Down;Run-Up Recordings

GE vb8
282 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 Measurement Types and their Uses
61
Coast-down/Run-up
Coast-down and run-up measuring involves taking a series of recordings
with a short delay between them. You can use this technique to study
the resonance behavior of a machine as its speed gradually increases
during power-up, or decreases during coast-down.
Tips for Coast-down/Run-up recordings
We recommend using a tachometer to obtain the RPM reading for each
measurement as this will aid interpretation.
You can set the recording interval as a time interval between recordings
or a change in machine RPM. We suggest setting it to a change in
machine RPM, with the RPM Difference set to machine speed / 20. This
will result in approximately 20 recordings being taken during a complete
coast-down or run-up.
Several recordings are taken during a coast-down or run-up. If you
intend to repeat the process several times on a machine, we
recommend you save each set of recordings to a separate location so
you can easily distinguish between these.

Table of Contents

Related product manuals