EasyManua.ls Logo

Geely GEOMETRY C 2023 - Page 136

Geely GEOMETRY C 2023
187 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
8
7
6
4
3
2
1
133
performance of the power battery as the
temperature changes.
Operating steps
Insert the charger into the AC charging
interface of the vehicle, press the charging
start button, and charge automatically after
swiping the card.
For the operation method of wall
mounted AC charging pile, see the
user manual attached to the charging pile.
Plug and pull the AC slow charging
plug vertically as carefully as possible
to prevent damage to the vehicle or
charging equipment.
Energy center
Click on the multimedia display screen in
sequence: homepage energy center
energy display. The energy status can be
viewed in this interface.
AC slow charging of charging
station
Operating steps
1. Stop the vehicle stably and switch the
gear to the parking gear (P);
2. Unlock the vehicle, press the charging
port cover, the charging port cover pops
up, and take out the protective cover of
the AC charging interface;
3. Remove the special AC charger for the
charging pile from the charging pile;
4. Press the button on the AC charger, and
insert the charger into the AC charging
interface of the vehicle body;
Starting and driving

Table of Contents

Other manuals for Geely GEOMETRY C 2023

Related product manuals