iv Installation Guidelines For Spark-Ignited Stationary Generators
Section 5: Electrical System
General Information ...........................................29
Connecting Generator Feeder Conductors .....29
Connecting Control Circuit Wires ....................30
Removing Rear Panel and Stub-Up Cover ......30
Typical Load Leads and Control Wiring
in Stub-Up ...........................................................30
Customer Load Wiring ......................................30
Control Wiring Connections .............................31
RTS Series Transfer Switch With T1
Fuse/Connection ....................................................... 31
Two-Wire Start .......................................................... 32
Optional Accessory Power ...............................33
Installing Stub-Up Cover and Rear Panel ........33
Transfer Switch Location ..................................33
Battery ................................................................33
General Safety Precautions ...................................... 33
Battery Requirements ............................................... 34
Battery Installation .................................................... 34
Section 6: Control Panel Startup / Testing
Control Panel Interface .....................................35
Using the AUTO/MANUAL/OFF Buttons .................. 35
Generator Setup .................................................35
Setting The Exercise Timer ....................................... 35
Before Initial Startup .........................................35
Install Wizard ............................................................ 35
Interconnect System Self Test Feature ..................... 35
Before starting, complete the following: .................... 36
Activate Unit .......................................................38
Checking Manual Transfer Switch
Operation ............................................................39
Operational Checks ...........................................39
Electrical Checks ...................................................... 39
Testing Generator Under Load ................................. 39
Testing Auxiliary Shutdown Switch Operation .......... 40
Checking Automatic Operation ................................. 40
Installation Summary ........................................40
Shutting Generator Down While Under
Load or During a Utility Outage ........................41
Section 7: Installation Checklists
Safety Checklist ................................................. 43
Installation Planning Checklist ........................ 43
Foundations and Mounting Checklist ............. 43
Ventilation System Checklist ........................... 44
Exhaust System Checklist ................................ 44
Gaseous Fuel System Checklist ...................... 44
Electrical System Checklist .............................. 45
Section 8: Troubleshooting/Quick Reference
Guide
Troubleshooting ................................................47
Quick Reference Guide ..................................... 48
Section 9: Accessories
Section 10: Installation Drawings
A0000293718 Rev B Page 1 of 2 ....................... 53
A0000293718 Rev B Page 2 of 2 ....................... 54
Alternator AC Lead Connections ..................... 55
Four-Lead, Single-Phase Stator ............................... 55
Alternator Power Winding Connections ......... 55
Three-Phase Alternators (“Y” Configuration) ............ 55
Three-Phase Alternators (“Delta” Configuration) ...... 56
Alternator Wiring Diagram ................................ 57