EasyManua.ls Logo

Genesis Upflow-NHW - Page 24

Genesis Upflow-NHW
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. Add 5 gallons of water.
16. Next add salt into brine tank. (40lb minimum, 120lb maximum.)
17. Install brine tank cover.
18. Turn a faucet on, away from the installation location, until the water from the plumbing lines has been purged.
19. Softening system is now fully operational.
20. Take a water sample to verify and test for hardness reduction.
21. Allow water and salt to stand for at least 6 hours and then perform a manual regeneration to ensure a proper
brine formation.
Genesis Upflow Valves & Systems Service Manual

Related product manuals