INSTALLATION GUIDE
Page 51
Powering up procedure
Once the controller is properly mounted on the wall and all modules and sensors are
connected to the terminal block, perform the following steps:
Verify all connections
Seal all cable entry holes.
Hermetically close the controller
Close the front panel and the lower access cover.
Put the power on
Secure the front panel with a lock