13XLp Installation & Configuration, June 2010
Hardware Installation (step by step)
12. Open the little door at the
side of the plotter crate to find
your power cable
13. Plug the cable in the back of
the left base assembly and
power up. After initializing the
carriage and cleaning station the
screen should look like this.
Don’t forget to put the
cartridge(s) in or you will get an
error message.