EasyManua.ls Logo

GIRBAU ED340 - Pre-Set Programs; Initial Content of the Programs; Explaining the Program Functions

GIRBAU ED340
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Program execution mode 19
Code no. 576017
Rev. nº 02/0415
4.7. Pre-set programs
The dryer allows three drying
programs to be selected:
Very hot program
Hot program
Warm program
4.7.1. Initial content of the programs
The factory-set content of the three drying programs is the following:
PROG.
DRYING TIME
HEATING
DRYING
TEMPERATURE
INPUT
TEMPERATURE
ROTATION
SPEED
ROTATION
COOLING-DOWN
TIME
28’
80ºC
176ºF
200ºC
392ºF
2’
28’
65ºC
149ºF
200ºC
392ºF
2’
28’
50ºC
122ºF
200ºC
392ºF
2’
4.7.2. Explaining the program functions
DRYING TIME
Duration of the drying phase.
The drying time countdown starts the moment the program starts.
HEATING
Option for activating the dryer’s heating system or not.
DRYING TEMPERATURE
Maximum temperature of the drying phase. When the temperature sensor detects a value equal to or greater
than the set temperature, the heating system is switched off.
INPUT TEMPERATURE
Maximum temperature of the air entering the machine. When the input temperature sensor detects a value
equal to or greater than the set temperature, the heating system is switched off.
ROTATION SPEED
Drum rotation speed (the rotation speed defined in the TABLES menu. Section 7.1.4).
ROTATION
The drum’s start, stop and reverse rotation intervals. (The rotation reversal intervals defined in the TABLES
menu. Section 7.1.4).
COOLING-DOWN TIME
Stage following the drying phase during which the dryer operates with the heating system off.
This stage is very important to lower the temperature of the linen, prevent creases in the fabric and reduce
the risk of fire due to combustion spontaneous.

Table of Contents

Other manuals for GIRBAU ED340

Related product manuals