EasyManua.ls Logo

GIRBAU ED340 User Manual

GIRBAU ED340
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Code No. 549758
Rev. nº 10/0418
Model
From Machine No.
ED260
ED340
ED460
ED660
ED900
ED1250
2,215,001
2,240,001
2,265,001
2,290,001
2,480,001
2,470,001
Installation Instruction Manual for
ED dryers
GIRBAU, SA
Crta de Manlleu, km. 1
08500 VIC (Barcelona) • SPAIN
National sales:
T.(+ 34) 902 300 359
comercial@girbau.es
International sales:
T.(+ 34) 938 862 219
sales@girbau.es
Service:
T.(+ 34) 902 300 357
sat@girbau.es
www.girbau.es
For USA and CANADA:
CONTINENTAL GIRBAU Inc.
2500 State Road 44
WI 54904 Oshkosh • USA
Tel. 1(920) 231-8222
info@continentalgirbau.com
www.continentalgirbau.com
EN
Installation
ED260/ED340
ED460/ED660
ED900/ED1250

Table of Contents

Other manuals for GIRBAU ED340

Questions and Answers:

GIRBAU ED340 Specifications

General IconGeneral
Capacity34 kg
Drum MaterialStainless Steel
Reversing DrumYes
Heating MethodElectric or Gas
Power Supply380-415V
Cooling SystemYes
ProgramsMultiple

Summary

IMPORTANT SAFETY INSTRUCTIONS

General Safety and Fire Prevention

Key precautions to reduce risks of fire, electric shock, and injury during operation.

Authorized Service and Responsibilities

Guidelines for authorized technical services and manufacturer responsibilities.

1. GENERAL DESCRIPTION OF THE MACHINE

2. RECEIPT, STORAGE AND TRANSPORT

3. LOCATION AND INSTALLATION

Ventilation and Exhaust System Requirements

Guidelines for premises ventilation and exhaust duct connections.

4. TECHNICAL AND CONNECTION DETAILS

General Technical Specifications

Table of machine specifications: capacity, volume, diameter, and heating types.

Electrical Connection and Protection

Details on electrical wiring, protection devices, and connection diagrams.

EC Certified Gas Heating Models

Heating data, NOx, gas types, and power for EC certified gas dryers.

Steam Heating Specifics

Values for steam heating power, flow rate, pressure, and connections.

5. CONNECTING THE MACHINE

Electrical Connection Requirements

Guidelines for electrical wiring, grounding, and compliance with standards.

Gas Connection Procedures

Precautions and steps for connecting the gas supply to the dryer.

9. INITIAL START-UP OF THE MACHINE

Pre-Start Checks and Procedures

Essential checks before starting the machine for the first time.

Gas Heating Combustion Analysis

Procedure for analysing combustion gases and making necessary adjustments.

Related product manuals