EasyManua.ls Logo

Glow-worm ENERGY 18r -A (H-GB) - Dimensions; Minimum Clearances; Clearance from Combustible Components; Using the Installation Template

Glow-worm ENERGY 18r -A (H-GB)
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation 4
0020200958_00 SUSTAIN ..r Installation and maintenance instructions 9
4.4 Dimensions
112
183,5 71
375
7833,5
602
220
150
32,5
100
157,5
1
2
3
4
5
6
1 Condensate discharge
2 Gas connection
3 Heating return
4 Heating flow
5 Connection on the back
of the air/flue pipe
6 Connection on the top
of the air/flue pipe
4.5 Minimum clearances
CC
A
B
D
Minimum clearance
A 150 mm
B 150 mm
C 5 mm
D 600 mm
4.6 Clearance from combustible components
It is not necessary to maintain a clearance between the
product and components made of combustible materials.
4.7 Using the installation template
Use the installation template to ascertain the locations at
which you need to drill holes and make breakthroughs.
4.8 Wall-mounting the product
Note
If you are using the rear air/flue gas connection,
install the flue pipe before you wall-mount the
product.
B
A
1. Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2. Check if the supplied fixing material may be used for
the wall.

Table of Contents

Other manuals for Glow-worm ENERGY 18r -A (H-GB)

Related product manuals