Repair
Repair Fluid T
emperature Sensor (FTS)
Installation
The Fluid Temperature Sensor (FTS) is supplied with
the system. Install FTS between main hose and
whip hose. See Heated Hose manual 309572 for
instructions.
Figure 17
Test/Removal
1. Perform Shutdown, page 50.
2. Remove tape and protective covering from FTS.
Disconnect hose cable (F).
3. If FTS is not reading properly at the end of the
hose, see Check RTD Cables and FTS, page 72.
4. If FTS fails, replace FTS.
a. Disconnect air hoses (C,L) and electrical
connectors (D).
b. Disconnect FTS from whip hose (W) and
fluid hoses (A, B).
c. Remove ground wire (K) from ground screw
on underside of FTS.
d. Remove FTS probe (H) from component A
(ISO) side of hose.
7
4
333024N

Other manuals for Graco Reactor 2 E-XP2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Graco Reactor 2 E-XP2 and is the answer not in the manual?

Graco Reactor 2 E-XP2 Specifications

General IconGeneral
BrandGraco
ModelReactor 2 E-XP2
CategoryPaint Sprayer
LanguageEnglish

Related product manuals