EasyManua.ls Logo

Gree GMV5

Gree GMV5
321 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE Photovoltaic Direct-driven Inverter Multi VRF Units
28
3.3 Installation Space Requirement for ODU
1. If all sides of the ODU (including the top) are surrounded by walls, process according to the
following requirements for installation space:
(1) Installation space requirements for the single-module unit
Unit: mm(in.)
(2) Installation space requirements for the dual-module unit
Unit: mm(in.)

Table of Contents

Related product manuals