16
Step 3 – Create plant
Fill in details of your system.
Come up with a name for your
installation
Date the system was installed in
Address where the system is installed
The power of your inverter (in watts)
Residential = Private system
Commercial = Commercial system
Ground mounted = Industrial system
The price per kWh of your network
operator and the currency
Step 4 – Link data logger to account (optional)
Attach the data logger to your account by entering the serial number and the check code
(CC). Do you want to link it at a later time? Then choose 'Jump over'.