Do you have a question about the Growatt ShineSEM-X and is the answer not in the manual?
Model | ShineSEM-X |
---|---|
Communication | RS485 |
Data Logging Interval | 5 minutes |
Operating Temperature Range | -25°C to 60°C |
Power Consumption | < 2 W |
Cooling Method | Natural Cooling |
Provides an overview of the ShineSEM-X manual's purpose and content.
Outlines Growatt's copyright for the user manual and usage restrictions.
Identifies the intended audience for this manual, including technical professionals and routine users.
Advises users to read the manual carefully and keep it accessible for installation and maintenance.
Details the physical appearance, internal components, and indicator lights of the ShineSEM-X.
Describes key internal components like the isolating switch, terminal block, circuit breaker, and current transformers.
Explains the operational principle of the smart array communication box in a photovoltaic system.
Provides instructions on unpacking accessories and physically installing the ShineSEM-X unit.
Details the correct procedures for connecting wires to the ShineSEM-X terminals.
Illustrates the wiring for a single-stage PLC communication setup with multiple inverters.
Shows the cascade system diagram for multi-level PLC monitoring using combiner boxes.
Diagram illustrating the ring network communication setup between multiple ShineSEM-X units.
Shows the schematic diagram of ring network switch connections for communication.
Details recommended wire cross-sectional areas and AWG sizes for different connections.
Explains how to access the device's web interface via static or dynamic IP for configuration.
Details the steps for logging into the ShineMaster-X system interface using default credentials.
Describes the main sections of the system interface: System Information, Product Maintenance, etc.
Step-by-step guide on how to add devices like inverters to the monitoring system.
Lists the available device types that can be added for monitoring, such as inverters and meters.
Explains how to configure the start address and count for added devices.
Instructions on how to remove devices from the monitoring system, with inverter as an example.
Details how to configure IP settings, including DHCP and manual IP configuration for the collector.
Explains how to set the server address, domain name, and upload interval for data transmission.
Lists the technical specifications for the ShineSEM-X, including voltage, communication, and dimensions.
Explains the components and meaning of the ShineSEM-X model number and configuration barcode.
Provides contact details for Growatt New Energy's customer service and company website.