Output source
priority: To configure
load power source
priority
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads, battery
energy will supply power the loads at the same time.
Utility provides power to the loads only when any one condition
happens:
-
Solar energy is notavailable
-
Battery voltage drops toeither low-level warning voltage orthe setting
point in program12.
Utility will provide power to the loads as first priority.
Solar and battery energy will provide power to the loads only when
utilitypower is not available.
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads, battery
energy will supply power to the loads at the same time.
Utility provides power to the loads only when battery voltage drops to
either low-level warning voltage or thesetting point in program 12.
Maximum charging
current: To configure
total charging current
for solar and utility
chargers.
(Max. charging current
= utility charging
current + solar charging
current)
18KW model: default 80A, 10A~340A settable
(If Li is selected in program 5, this program canāt be set up)
Appliance (default)
If selected, acceptable AC input voltage range will be within
154~272VAC
UPS
If selected, acceptable AC input voltage range will be within
184~272VAC