Commissioning
6
Installation
5.1 Basic installation requirements
5.2 Installation requires tools and
RJ 45 terminal sequence of the
LAN line
5.3 Installation Instructions
5.4 SPH System Connection Mode
5
6.1 Commissioning of SPH
6.2 Operation modes
6.3 Country setting
6.4 Display and button
6.5 Communication
Start-up and shut
down SPH system
7
7.1 Start-up the SPH system
7.2 Disconnect the SPH system
Attention of the
installation
environment,
maintenance and
cleaning
8
Fault removal
9
11.1 Dismantling the energy storage
11.2 Packing the SPH inverter
11.3 Storing SPH inverter
11.4 Disposing of the SPH inverter
Decommissioning
Manufacturer
Warranty
11
10
Product specification
12
12.1 Growatt SPH series energy
storage machine product
specification
12.2 DC input terminal parameter
12.3 Torque
12.4 Appendix
Certificate
13
Contact
14