HIGHLANDER II VERTICAL PLATFORM LIFTS: Install Manual
17FEB2021 | 630-00113 REV C
11
PREPARATION
HIGHLANDER II: SECTION 3
CONCRETE
Concrete pad should be no less than 4" thick,
3500 PSI reinforced, and must be level. The size
of the concrete pad may vary depending on the
size of the VPL footprint. Concrete at the

enough to turn a mobility device around. Pay


concrete on the exterior of a house or building
are normally sloped to shed water. The normal
"" per foot to provide
adequate drainage. Steel shims should be used


" per foot, it should be
reworked and leveled before installing the VPL.


CAUTION
!
NOTE: Do not shim more than 1/2".
Harmar recommends securing the lift using
our Anchor Kit
MATERIAL HANDLING


CAUTION
!
It may be necessary to move the VPL around
once its on the job site. Extra material handling
equipment such as manual carts, a pallet jack,


by man power. All of the tower panels can be
removed to reduce the weight of the tower. Care
should be taken not to scratch or damage panels
when removing, carrying, and reinstalling them.
Special care must be taken to protect any

be damaged by the uses of material handling
equipment.
HOIST WAY (SHAFT)

someone other than the installer, its important


include any rough in electrical requirements for
gate/door, interlock, or call send wiring.
NOTE: Hoistway must comply with the IBC or IRC building codes.
SITE PREPARATION

power supply and disconnect per NFPA 70.





of the concrete slab must be large enough for

If there was a blueprint created for the project
check that all work matches the blueprint.
Running clearance measurements should be


top landing and overhead clearance. Ensure
there are no pinch points.
If doors are supplied by others check that

are required. If other non Harmar supplied
equipment (power door openers, interlocks,
and/or door strikes) are going to be used, check

The front tower panel and the top cover must be
removed before any power, gate/door, call send
