EasyManua.ls Logo

HARWI 625-U - MACHINE INSTALLATION AND SECURING; SECURING MACHINE TO THE GROUND

Default Icon
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
SECURING MACHINE TO THE GROUND
SECURING
1 Mark the holes for the adjusting bolts on
the floor.
2 Remove plastic caps if necessary.
3 Move the machine.
4 Secure adjusting bolts.
5 Place the machine over the bolts.
6 Check if the machine is level. If
necessary fill up.
7 Fasten with proper tool.

Related product manuals