Pre-Startup Checklist
Directions: Email completed checklist to service@haskris.com at least 10 days in advance of start-up.
Model: Serial Number: __________________________
Site Name: _____________________________ Address: _________________________________
_____________________________
Location:
❑ Unit is securely mounted and level.
❑ Minimum of 36” clearance exists on the front of the unit, and minimum of 18” clearance exists above
and to the sides of unit.
Fluid Connections:
❑ All piping is of non-ferrous materials and complies with local codes.
❑ Beginning and end of hard pipe runs are terminated with vibration isolators or a short length of hose.
❑ Isolation ball valves are installed between WW and building water or glycol loop connections.
Electrical Power:
❑ Incoming voltage and circuit breaker size for incoming power match unit’s nameplate.
❑ Confirm proper electrical power and phase by checking the phase monitor’s status indicator.
Communication:
❑ Communication wiring between the WW and OPC is installed (if Haskris chiller was provided).
Fluid fill:
❑ The tank is full of drinking/spring water. The tank should be filled to about 3” from the top of the tank,
just below the overflow.
❑ Additional drinking/spring water is on-hand for service contractor to top off system when start-up is
performed.
Installation Completed By (Please Print):
Company: ____________________________________ Phone: ___________________ Email: __________________
Name: __________________________________________________________ Title: ____________________________
Signature: ___________________________ Date: __________