EasyManua.ls Logo

HDG F20 - Installing the heating system

Default Icon
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Planning and installation – Scope of delivery
30
4.5 Scope of delivery
The boiler is delivered on a pallet. Included in the scope of delivery:
Boiler HDG F20-50
Cladding
Cleaning tools
Control unit HDG Control Touch
Accessories
Operating documentation
4.6 Installing the heating system
REQUIREMENTS
The heating system is installed by specialists from HDG Bavaria
GmbH or an authorised HDG partner and a qualified electrician.
Important!
Upon delivery, small parts are located in the fuel chamber of the
HDG F20-50 boiler.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be
damaged and persons may be injured due to secondary damage.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Switch off the mains supply to the heating system during the
installation.

Table of Contents