1.4.3 Checking List (FSG and FS3 Series)
CLIENT: INSTALLER: DATE:
O.U. MODEL: O.U. Serial No.: Checker:
I.U. Indoor Unit,   O.U.: Outdoor Unit
Piping Length:              m Additional Refrigerant Charge:                 kg
(1) General
No.
1
2
3
4
5
6
(2) Refrigerant Cycle
a. Operation (Cooling/Heating)
No.
1
2
3
b. Sampling Data
No.
1
2
3
4
Result
 Was the dip switch, DSW3 for piping lift in O.U. set?
 Is the transmitting wire contacting to power lines?
 Was an earth wire connected?
 Is there any short circuit?
 I.U.
 Model
 I.U.
 Serial No.
Check Item
 Was the dip switch, DSW6 for piping length in O.U. set?
Check Item Result
 Is there any voltage abnormality among each phase (L1-L2, L2-L3,
 L3-L1, L1-N
.
 Operate all the indoor units ("TEST RUN" mode).
 Operate all the indoor units at "HIGH" speed.
 Is Pd 1.2 to 2.2?  (If the outdoor temperature is high, Pd becomes high.)
CHECK LIST ON TEST OPERATION
 Check Pd and Td.  Is Td-SH 20 to 40 deg.?