EasyManua.ls Logo

Holzmann BS 128HDR - 12 ASSEMBLY

Holzmann BS 128HDR
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
HOLZMANN Maschinen Austria www.holzmann-maschinen.at Seite 29
BS 128HDR
12 ASSEMBLY
12.1 Preparatory activities
12.1.1 Scope of delivery
After receipt of the delivery, if all parts are in order. Report any damage or missing items imme-
diately to your dealer or the shipping company. Visible damage must also be recorded without
delay in accordance with the provisions of the warranty on the delivery, otherwise the goods shall
be accepted as properly.
12.1.2 Workplace
Choose a suitable place for the machine. Observe the safety requirements of Chapter 11 and the
dimensions of the machine from Chapter 3.2.
The selected location must ensure as well as the possibility for connection to an extraction system
a suitable connection to the electrical grid.
Make sure that the floor can support the weight of the machine. The machine must be leveled on
all bases simultaneously.
You must also secure around a distance of at least 0.8 m around the machine. Before and behind
the machine must be provided the necessary distance for the supply of long workpieces.
12.1.1 Transport / unloading the machine
Lifting it out of the package for mounting and positioning on the workstation:
at least 2 people!
For maneuvering of the machine in the packaging is also a pallet truck or a forklift can be used.
You can move the BS 128HDR after assembly by the wheels.
To do this, pull the lift handle and lift the front machine part.
Now you can move the machine.
WARNING
The lifting and transportation of the machine may only be carried out by
qualified personnel are carried out with appropriate equipment.

Table of Contents

Related product manuals