NOTE:
●In order to avoid current pulse during start-up, pre-discharge function should be added to
high voltage system. All connected batteries should be turned on first, and then the circuit
breaker between high voltage system and inverter should be turned on.
●Circuit breaker shall be installed between high voltage system and inverter to protect system
safety.
●All installation and operation must comply with local electrical standards.