Stack’d Series HOMEGRID Technical
Page 26 Chapter 6: Installation
5.3. Parallel Installation
A. Stack the whole system (team lift)
(1) Place the system base at the bottom
(2) The corresponding interface terminals are stacked one by one to connect the battery modules
(team lift)
(3) Finally, place the main control module at the top of the system